vent lines and drain lines must be adapted to final pipe routing 如何翻译

来源:学生作业帮助网 编辑:六六作业网 时间:2024/05/24 05:47:05
ventlinesanddrainlinesmustbeadaptedtofinalpiperouting如何翻译ventlinesanddrainlinesmustbeadaptedtofinalp

vent lines and drain lines must be adapted to final pipe routing 如何翻译
vent lines and drain lines must be adapted to final pipe routing 如何翻译

vent lines and drain lines must be adapted to final pipe routing 如何翻译
排气管和排水管必须与施工图管道路径相符.

通风线路和排水线路必须根据最终的管道路线做出改造