求5000大卡以上电煤,1以下含硫量,含税

来源:学生作业帮助网 编辑:六六作业网 时间:2024/05/04 09:58:38
求5000大卡以上电煤,1以下含硫量,含税求5000大卡以上电煤,1以下含硫量,含税求5000大卡以上电煤,1以下含硫量,含税EASTKALIMANTANItemGuaranteeRejectTota

求5000大卡以上电煤,1以下含硫量,含税
求5000大卡以上电煤,1以下含硫量,含税

求5000大卡以上电煤,1以下含硫量,含税
EAST KALIMANTAN

Item Guarantee Reject
Total Moisture (ARB) 17% Max 19%
Inherent Moisture (ADB) 10/8% 12/10%
Ash Content (ADB) 14% 16%
Volatile Matter (ADB) 42%
Fixed Carbon (ADB) By Difference
Total Sulphur (ADB) 1.0% 1.2%
Gross Calorific Value (ADB) 6,300 Kcal/kg 6,100 Kcal/kg
Hardgrove Grindability Index 40-50 Approx
Size 0mm-50mm 90%
L/C开证:约45天交货
Take to ship about 45days after accept the L/C at sight.
Port:loading port is MJARA SAWA OR MUARA BERAU
Rate:4days for 30,000t

Item Guarantee Reject
Total Moisture (ARB) 20% Max 30%
Inherent Moisture (ADB) 12% 14%
Ash Content (ADB) 8% 10%
Volatile Matter (ADB) 42%
Fixed Carbon (ADB) By Difference
Total Sulphur (ADB) 0,8% 1.0%
Gross Calorific Value (ADB) 5,800 Kcal/kg 5,600 Kcal/kg
Hardgrove Grindability Index 50 Approx
Size 0mm-50mm 90%
L/C开证:约30-35天交货
Take to ship about 30-35days after accept the L/C at sight.
other:5300-5100KCAL coal low 5100
L/C开证:约30天交货 Take to ship about 30days after accept the L/C at sight. 7500t Mother fessel di sini mau 30,000T 7500T
Transfor 7500*4 6-12hours sampai ke mother ship
QQ:137503189