英语翻译PlanningThe planning phase strarts with a detailed study of construction plans and specifications.From this study a list of all items of work is prepared ,and related items are then grouped together for listing on a master schedule.A sequ

来源:学生作业帮助网 编辑:六六作业网 时间:2024/05/02 11:17:59
英语翻译PlanningTheplanningphasestrartswithadetailedstudyofconstructionplansandspecifications.Fromthisst

英语翻译PlanningThe planning phase strarts with a detailed study of construction plans and specifications.From this study a list of all items of work is prepared ,and related items are then grouped together for listing on a master schedule.A sequ
英语翻译
Planning
The planning phase strarts with a detailed study of construction plans and specifications.From this study a list of all items of work is prepared ,and related items are then grouped together for listing on a master schedule.A sequence of construction and the time to be allotted for each item is then indicated .the method of operation and the equipment to be used for the individual work items are selected to satisfy the schedule and the character of the project at the lowest possible cost and income.
\x05Execution
\x05The speedy execution of the project requires the ready supply of all materials,equipment,and labor when needed.The construction engineer is generally responsible for initiating the purchase of most construction materials and expediting their delivery to the project.Some materials,such as structural steel and mechanical equipment ,require partial or complete fabrication by a supplier.For this fabricated materials the engineer must prepare or check all fabrication drawings accuracy and case of assembly and often inspect the supplier’s fabrication.
\x05Other construction engineering duties are the layout of the work by surveying methods,the preparation of detail drawing to clarify the design engineer’s drawings for the construction crews,and the inspection of the work to ensure that it complies with plans and specifications.
\x05On most large projects it is necessary to design and prepare construction drawings for temporary construction facilities,such as drainage structures,access roads ,office and storage buildings,formworks,and cofferdams.other problems are the selection of electrical and mechanical equipment and the design of structural features for concrete material processing and mixing plants and for compressed air ,warter ,and electrical distribution systems.

英语翻译PlanningThe planning phase strarts with a detailed study of construction plans and specifications.From this study a list of all items of work is prepared ,and related items are then grouped together for listing on a master schedule.A sequ
规划
在规划阶段开始之前,要对整体的建造计划和规格进行仔细的研究.经过这个研究后,可以得出工作需要的所有的物资项目清单,而且相关的项目这时应该是收集在一起,以便列入计划进度总表,也应该得出每个项目的建造顺序和对应的应该分配的时间.计划表所需要的操作方法和个人工作的工具应该被挑选出来,以便使整个工程的成本和收入(?)最低.
先来一段,最后一句话是不是没完?

计划
实施
太长了。

规划
规划阶段strarts提供详细的研究计划和规格。这项研究列出所有工作项目准备和相关的项目,然后组合在一起的上市计划。一个施工顺序及时间分配给每个项目的表示。操作的方法和设备被用于单个工作项选择满足进度和性质的项目,以最低的成本和收入。
执行的
迅速执行的项目需要随时提供所有材料,设备和劳动力,需要时。建筑工程师通常是负责发起购买大多数建筑材料和加快交付的项目。有些材料...

全部展开

规划
规划阶段strarts提供详细的研究计划和规格。这项研究列出所有工作项目准备和相关的项目,然后组合在一起的上市计划。一个施工顺序及时间分配给每个项目的表示。操作的方法和设备被用于单个工作项选择满足进度和性质的项目,以最低的成本和收入。
执行的
迅速执行的项目需要随时提供所有材料,设备和劳动力,需要时。建筑工程师通常是负责发起购买大多数建筑材料和加快交付的项目。有些材料,如钢结构和机械设备,需要部分或完整的制造供应商。为编造材料工程师必须准备或检查所有制造图纸的准确性和案件组装,并经常检查供应商的制造。
其他建筑工程的职责是布置的工作的测量方法,编写详细阐明设计工程师的图纸施工人员和检查工作,确保其遵守计划和规格。
最大型的项目需要设计和编制施工图施工临时设施,诸如道路,排水结构,办公室和仓库的建筑物,模板,和cofferdams.other问题选择机电设备的设计及结构特点,对混凝土材料加工和混合植物和压缩空气,水,和分配系统。

收起

规划阶段的规划以施工计划和技术规格的详细研究为起点。从本研究的各项工作准备,和相关的项目,然后进行分组主时间表上市。建设和分配给每个项目的时间序列,然后表示。选择的操作方法和个别工作项目使用的设备,以满足在尽可能最低的成本和收入的时间表和项目的性质。
执行该项目的迅速执行,需要准备的所有材料,设备和劳动力的供应,在需要的时候。建筑工程师一般是负责发起的大多数建筑材料的购买,并加快其运送到该...

全部展开

规划阶段的规划以施工计划和技术规格的详细研究为起点。从本研究的各项工作准备,和相关的项目,然后进行分组主时间表上市。建设和分配给每个项目的时间序列,然后表示。选择的操作方法和个别工作项目使用的设备,以满足在尽可能最低的成本和收入的时间表和项目的性质。
执行该项目的迅速执行,需要准备的所有材料,设备和劳动力的供应,在需要的时候。建筑工程师一般是负责发起的大多数建筑材料的购买,并加快其运送到该项目。有些材料,如结构钢和机械设备,要求由供应商的部分或全部制造。对于这种捏造的材料工程师必须准备或检查所有制造图纸的准确性和集会的情况下,并经常检查供应商的制造。其他建设工程的任务是测量方法的工作布局,绘图设计工程师的图纸,施工队伍,以澄清详细的准备和检查工作,以确保它符合计划和规范。在大多数大型项目,它是必要的临时建筑设施,如排水结构,通路,办公和储存建筑物,模板,和围堰等其他问题,施工图纸设计和准备的电气和机械设备的选择和设计处理和搅拌站的混凝土材料和压缩空气,水和配电系统的结构特点。

收起